Division S Structures
These parts specify the requirements for the construction of structures, including piling, bridge works, reinforced soil structures, soil nailing and protective treatment of steel.
Document Name | Comments / Instruction |
Contract Specific Technical Requirements Division S Structures | Effective 1 July 2018 |
Part S10 Earthworks for Structures Effective | Effective 1 July 2018 |
Part S15 Supply and Installation of Driven Piles | Effective 1 July 2018 |
Part S16 Cast In Place Concrete Piles | Effective 1 July 2018 |
Part S17 Continuous Flight Auger Piles | Effective 1 July 2018 |
Part S20 Reinforced Soil Structures | Effective 1 July 2018 |
Part S22 Soil Nailing | Effective 1 July 2018 |
Part S24 Pretensioned Concrete | Effective 1 July 2018 |
Part S25 Postensioned Concrete | Effective 1 July 2018 |
Part S26 Transportation and Erection of Structural Members | Effective 1 July 2018 |
Part S28 Fibre Reinforced Polymer Composite Strengthening of Concrete Structures | Effective 1 July 2018 |
Part S30 Fabrication of Structural Steelwork | Effective 1 July 2018 |
Part S35 Protective Coating of Structural Steelwork | Effective 1 July 2018 |
Part S36 Protective Treatment of Structural Steelwork Previously Coated | Effective 1 July 2018 |
Part S37 Galvanizing | Effective 1 July 2018 |
Part S40 Bearings | Effective 1 July 2018 |
Part S45 Expansion Joints | Effective 1 July 2018 |
Part S55 Bridgeworks Sundries | Effective 1 July 2018 |