Skip to main content

Division P Professional Services

These parts specify the requirements for professional services and are only used with AS4122:2010 General Conditions of Contract for Engagement of Consultants.  It includes parts for the planning of infrastructure projects, preparation of Reference Designs and Detailed Designs, Design Verification and Construction Verification.

Refer to Division D for design requirements in Design and Construct Contracts.

Document NameComments / Instruction

Part P20 Planning General

Effective 1 July 2018

Part P30 Planning Processes

Effective 1 July 2018

Part P70 Outputs and Reports

Effective 1 July 2018

Part P80 Reference Design

Effective 1 July 2018

Part P85 Detailed Design

Effective 1 July 2018

Part P86 Design Environmental

Effective 1 July 2018